Project

PROJECT DETAILS

Client:The City of North Miami

Location: City of Opa Locka, FL

Construction Cost: $395,827

DRAINAGE & STORMWATER MANAGEMENT

City of Opa-Locka awarded the design-build contract to Mastermind Construction, Inc. with EBS Engineering, Inc. as the lead design consultant for the about 1.0-mile Section of the 2-lane rural collector roadway. The project consists of analysis of existing drainage system, milling and resurfacing of the deteriorating roadway, signing and pavement marking, utilities coordination, permitting including surveying and geotechnical works.