Project
PROJECT DETAILS
Client: FDOT D6
Location: From Alton Rd to Collins Ave
Construction Cost: $2,340,000
ABOUT PROJECT
FDOT D6 awarded a contract to EBS Engineering, Inc. as the prime consultant for the design of about 1-mile section of the 5-lane urban highway for resurfacing. The project consists of milling and resurfacing of the deteriorating roadway including surveying, signing and pavement marking, signalization, utility coordination, safety improvements (bridge retrofit, etc.), ADA ramp, sidewalk reconstruction, post design services, etc.
PROJECT MILESTONES
EBS completed the project
- Ahead of schedule
- Within the budget