Project
PROJECT DETAILS
Client: The City of Opa-Locka
Location: On the northeast corner of Perviz Avenue and Sultan Street
Construction Cost: N/A
The city of Opa-Locka awarded the design-build with EBS Engineering, Inc. as the design consultant for Opa Locka Sanitary Sewer Pump Station # 10 and associated force main rehabilitation. This pump station is located on the northeast corner of Perviz Avenue and Sultan Street in a predominantly single family residential neighborhood of Opa Locka.
The project consisted of rehabilitation of the pump station and installation of new 12” force main along Perviz Avenue area of the City. The design elements including data collection, data analysis, design of submersible pump station, design of about 2500 linear feet of new force main, construction plans and documents preparation through construction phase services, permitting, commissioning, etc.