Transportation

NE 2nd Ave From W.Little River Canal to NE 91st Street

Design Phase:

Tasks for this phase included preparation of roadway and bridge design plans with cost estimates based on the master plan recommendations, and was divided into 30%, 60%, 90% and final design. Subtasks included securing for use field survey, aerial photography, soil survey investigations from subconsultants, utilities locations coordination,and assistance with permitting. Each submittal requires the development of design plans for comprehensive bridge and roadway widening, drainage, sidewalks, street lighting, signalization, pavement marking and signing